There are four routes to consider:
- Mass medication
-
Change in
pig flow - which could be to a completely different
batching system (For example:
Three week
batching)
-
Partial depopulation
-
Full
depopulation and repopulation
Protocols
These notes are
to be issued in
combination with
Biosecurity Protocols
Standard down times:
- This depends on the diseases to be
eliminated. For instance with Swine Dysentery it should be a
minimum of 8 weeks
- For routine restock 6 weeks would be the
suggested minimum
TOP
Depopulation:
Depopulation means total removal of all pigs and
their products from the farm for the down time period
TOP
Procedures:
- Rodent control should start and be
vigorous.
See
Rodent Control Protocols.
Place water near baits to encourage intake.
- Pig Flow ? calculate the required pig
flow model to allow the farm to legally maximize its output. Aim
where possible to achieve all-in/all-out in all parts of the
farm, in particular finishing area. Consider all possibilities
including batch farrowing to achieve all-in/all-out.
- Obviously as animals are sold, buildings
become empty and they are to be cleaned and repaired as they
become empty.
- Run down all stocks of medicines, feed and
disposables
-
It will probably be necessary to
arrange stockperson schedules to ensure that ?dirty? stockpeople
do not enter ?cleaned buildings? .
TOP
Cleaning Buildings:
- See
Pressure
Washing protocols
- Pay particular attention to the removal of
all fecal material. The building should be brushed down
thoroughly and then dry cleaned using a knife and scrape
to remove all visible feces. The small amounts should be removed
with a dustpan and brush. This has to be very thorough and on
your hands and knees.
- Remove dust by vacuuming where possible
- Areas of particular note ? pigs have long
tongues
- Under and around gate posts and gates
- Corners at the back of pens
- Around fittings i.e. farrowing crates
- Under drinkers and troughs
- Where cracks and holes exit in the concrete
- Repair all large cracks and holes in
concrete by
- Cleaning out where possible
- Pouring a suitable disinfectant
- Once dry repair by screeding over with concrete
- All wooden partitions and removable objects
should be soaked in disinfectant for a period of 3 to 5 days
using metal baths. Place outside in sunlight to dry
- Drain and clean the slurry channels and pits.
Remove all available feces. Sometimes this is impractical but it
is essential to clean to 30 cm below the removable slats
- Ideally lime wash all surfaces especially up
to 2 meters and spray with Vircon S using a knap sack sprayer
into the ceiling and loft areas.
(Lime
washing protocols)
- Ensure that the water supplies are adequately
disinfected.
- Repair all equipment to the necessary
standards.
TOP
Water:
- Ensure adequate flow is obtainable from all
drinkers.
- This may necessitate replacement of all
pipelines.
- Ensure water pressure adequate around the
system
TOP
Air:
- Ensure all ventilation system thoroughly
cleaned.
- All fans must be checked that they perform as
required.
- Repaint all the blades.
- Check fan speeds with a tachometer and volt
meter
TOP
Floor
- All floors must be none abrasive.
- All sharp points are to be removed or
covered.
- Note worn doorways, concrete under water
points and around feeders, in particular wet feeding systems.
- All holes and cracks are to be repaired worn
rough slats to be repaired or replaced
TOP
Feed
- Ensure all feeders work as required.
- All old food needs to be thoroughly removed
and sharp edges smoothed.
- Any holes repaired and if feeders leak and
cannot be repaired they must be thrown away.
- Feed is the major cost and any waste should
be avoided
TOP
Vermin
Bird proof all buildings where possible
(future
Salmonella controls)
TOP
Cleaning when
farm unit is empty
- Ensure unit perimeter secure (High Health
protocols)
- Finish cleaning the last building
- Dispose of all medicines, needles and
syringes. This should include all medicines
- Remove all disposables from the farm,
including all feed. Empty all feed hoppers and feed bins.
Ideally all feed should have been eaten
- Surfaces: Ensure all surfaces are cleaned.
This must include the fridge, chemical store, feed stores,
changing rooms and staff room
- Midden area
- Spread all the midden materials and lagoons and slurry store
- The soil within the proximity of the midden area has feces
still remaining from the old unit.
- Skin off this area to a depth of 80 cm.
- Spray the soil with disinfectant and then rescree over the 80
cm of soil
- Straw and other bedding: Old straw remaining
from the old unit should be moved and disposed off as this can
harbor mice/rats from the old unit
- Dogs and cats
- Discuss dog and cat protocols.
- Treatment may be required depending on the diseases to be
eradicated
- Tractors: Ensure all tractors and equipment,
in particular muck spreading and bob cats, are thoroughly
cleaned and disinfected
- Burn all straw and used bedding
- Dispose of all brushes, shovels and scrapes
- Dispose of all overalls, boots and protective
clothing
- Purchase clothing for the new clean unit
TOP
Cleaning Entire Farm:
- Pressure wash all buildings
- Lime wash all buildings
- Fumigate all buildings
- Seal all buildings as each building becomes
clean
- Dispose of all clothing, boots and purchase
new when whole farm finished
TOP
After fumigation:
- Restore water supplies and check all drinkers
work.
- Note: when water supplies cleaned deposits
can block the drinkers
- Ensure rodent controls are maintained
particularly at the perimeter of the farm
TOP
New stock
introduction and biosecurity
- The new stock require isolation procedures
(Gilt and
boar introduction)
- Note the biosecurity requirements: these
obviously vary depending on the health of the incoming stock
(Biosecurity protocols)
TOP
|
|
|
|
|